Loss Prevention

Seguridad Operaciones Salvataje Ajustadores y Peritos de Seguros

LOSS PREVENTION

  • Control and Supervision of Import-Export general loading, based on our Prevention programs included in 4 stages:

 

STAGE I

PREVENTION PROGRAM (SEA LOAD)

  • Cargo Manifest and Ship Movement.
  • On board identification of goods according to the Stowage Plan Reading (Protest Possibility).
  • Unload Supervision (Reports and/or payroll issue according to supervised load types).
  • Checking and Verification of Containers Safety Seals according to the Bill of Lading.
  • Tally Sheet Comparison.
  • Supervision of Container Opening with consolidated goods.
  • Repacking of damaged bulk and load with possible damage refurbishing in order to avoid worsening and loss.
  • Inventoried goods assistance up to the safety cage and certification of the inventory weight.
  • Assistance up to the Storehouses, Zones of T.P.C. and other terminals.
  • Attending the inventory (with special material for repacking: sealer stickers, tapes, etc.)
  • Claim Letters Delivery to the Maritime, Shipping and/or Forward Agent.
  • Advice regarding Packing.

 

PREVENTION PROGRAM (AIR CARGO)

  • Reception at the air ramp (24hours)
  • Goods supervision until they are officially delivered and received at the corresponding Air Terminal.
  • Verification and Registration of bundle number, weight and delivery and receip conditions at the air Terminal.
  • Bundles considered in bad conditions are repacked (sealed) by S.O.S. personnel before entering the Inventory Storehouse.
  • Claim Letter properly issuance to Airline and Shipping company because of lost, bad conditions and weight difference bundles.
  • Assistance at the Inventory.
  • Recommendations and advice regarding packing when necessary.

 

   Stage II

  PREVENTION PROGRAM (AIR AND MARITIME LOAD)

  • Assitance in previous acknowledgments (Weight difference – bad condition bundle).
  • Control and Supervision of Appraisal.
  • SENASA inspections.

 

Stage III

-PROGRAM PREVENTION (AIR AND MARITIME LOAD)

  • Load supervisión (withdrawal date).
  • Weight control at departure: T.P.C. scale and other Air and Maritime Terminals.
  • Installation of hard link numbered Safety Seals with S.O.S. logo.
  • Transport Supervision to the Insurer’s and/or Client’s Final Warehouse.

 

Stage IV

-INSPECTION PROGRAM

  • Goods revision and checking based on documentation (Invoice-Packing List) ah the Final Warehouse.
  • Issuance of Inspection Certificate.
  • Assessment and remarks in case of possible damage and/or shortage.
  • Loss assessment.
  • Casualty origin and cause announcement (Recommendations and Advice).